An Important Community-Wide Safety Project

The Ohio Administrative Code (3745-95) requires the development of a cross-connection control plan to secure public water systems. Cross-connection control focuses on eliminating or protecting hazardous interconnections in the public water supply system which, in the event of a backflow incident, could inject pollutants and contaminants in the drinking water.