Cross-Connection Control Program

Residential Cross-Connection Control Program

Ensuring Clean, Safe Drinking Water and Regulatory Compliance is Gibraltar's top priority.

The city of Gibraltar is conducting a cross-connection control surveys to protect your community’s drinking water from potential contamination. 

These surveys, mandated by the state, cover residential and non-residential water connections to identify potentially harmful interconnections to the public water supply. HydroCorp, a nationally trusted water safety and compliance expert, has been contracted to perform inspections on behalf of your utility.

An Important Community-Wide Safety Project

The Michigan Department of Environment, Great Lakes and Energy (EGLE) requires public water systems to implement a cross-connection control program addressing both residential and commercial water service connections.

This web page serves to assist Gibraltar water customers with their participation in this important safety program. The city has selected HydroCorp to assist with coordination, on-site surveys, and data and compliance management.

Water customers can call the HydroCorp hotline at (844) 493-7641 if you would like to schedule a specific time for your survey.

The cross-connection surveyor arrives with I.D. and conducts an exterior inspection. The surveyor documents any potential corrective actions and explains next step responsibilities to owner. Corrective actions instructions are also mailed to the property owner with a compliance due date.

HydroCorp sends postal letter with instructions for what to expect.

The property owner contacts HydroCorp when corrections have been made and schedule an on-site compliance inspection.

Hydrocorp sends postal letter with instructions to set appointment.

Water Customers can visit the website OR call toll free HydroCorp Hot-line at
844-493-7641

Cross-Connection Surveyor arrives with I.D. and conducts exterior inspection. Surveyor documents existing and any potential corrective actions, explains next step responsibilities to owner. Corrective actions instructions are also mailed via postal to building owner with compliance due date.

Water Customer/Owner contacts Hydrocorp when corrections are made and onsite compliance inspection is scheduled.

RESIDENTIAL WATER CUSTOMERS

Cross-Connection and Backflow FAQ

PART I: INSPECTIONS / SURVEYS

PART II: BACKFLOW PREVENTION ASSEMBLY TESTING

PART III: GENERAL RESOURCES

Commercial Facility Water Customers

Cross-Connection and Backflow FAQ

PART I: INSPECTIONS / SURVEYS

PART II: BACKFLOW PREVENTION ASSEMBLY TESTING

PART III: GENERAL RESOURCES