Cross-Connection Control Program

Cross-Connection Control Program Overview

Your local water provider is making improvements to protect the safety of drinking water. Here’s why.

A cross-connection is an actual or potential connection between the safe drinking water (potable) supply, and a source of contamination or pollution. Cross-connections can result in a hazardous event known as backflow, which can draw those contaminants into your drinking water supply.

Delaware’s Department of Health Code 4462 prohibits hazardous interconnections to public water systems and requires all public water systems to develop a comprehensive Cross-Connection Control Program.

Step 1
Hydrocorp Assistance

Hydrocorp hired by local water purveyor to assist with mandatory Cross-Connection Control Program (CCC).

Step 4
Data/Corrective Action

If cross-connections are identified during the inspection, the water customer is provided written instructions for modifications and a mandatory compliance date.

Step 2
Postal Notification

Hydrocorp sends notifications informing water customers of plumbing code requirements that backflow preventers must be tested annually. Facility Assessments/ Inspections for Cross-Connection Hazards are required as specified within the local CCC plan. Instructions and due dates are included in notifications.

Step 3
Onsite Inspection/Survey

Water Customer selects and hires an ASSE approved Backflow Preventer Tester and/or Cross-Connection Inspector. Test and Inspection data are submitted online to the local water purveyor/utility.

Step 5
Compliance Verification

Annual Backflow preventer test and inspection records confirmed and maintained by the local water purveyor as required by law

Step 1
Hydrocorp Assistance

Hydrocorp hired by local water purveyor to assist with mandatory Cross-Connection Control Program (CCC).

Step 2
Postal Notification

Hydrocorp sends notifications informing water customers of plumbing code requirements that backflow preventers must be tested annually. Facility Assessments/ Inspections for Cross-Connection Hazards are required as specified within the local CCC plan. Instructions and due dates are included in notifications.

Step 3
Onsite Inspection/Survey

Water Customer selects and hires an ASSE approved Backflow Preventer Tester and/or Cross-Connection Inspector. Test and Inspection data are submitted online to the local water purveyor/utility.

Step 4
Data/Corrective Action

If corrective action is identified during the facility Cross-Connection Inspection, the water customer is provided written instructions and a mandatory compliance date.

Step 5
Compliance Verification

Annual Backflow preventer test and inspection records confirmed and maintained by the local water purveyor as required by law

RESIDENTIAL WATER CUSTOMERS

Cross-Connection and Backflow FAQ

PART I: INSPECTIONS / SURVEYS

PART II: BACKFLOW PREVENTION ASSEMBLY TESTING

PART III: GENERAL RESOURCES

Commercial Facility Water Customers

Cross-Connection and Backflow FAQ

PART I: INSPECTIONS / SURVEYS

PART II: BACKFLOW PREVENTION ASSEMBLY TESTING

PART III: GENERAL RESOURCES

Additional Information