Cross-Connection Control Program

ypsilanti

Cross-Connection Control Program

Ensuring Clean, Safe Drinking Water and Regulatory Compliance is Ypsilanti's top priority.

YCUA is currently compliant with state- mandated cross-connection control regulations.

This regulatory program has previously focused on on-site visual inspections of non-residential water service connections to identify potentially harmful interconnections to the Ypsilanti public water supply.

The program now also includes residential inspections in compliance with Michigan Department of Environment, Great Lakes and Energy (EGLE) regulations. YCUA conducts these inspections.

An Important Community-Wide Safety Project

The Michigan Department of Environment, Great Lakes and Energy (EGLE) now requires public water systems to implement a cross-connection control program addressing residential service connections.

This web page serves to assist Ypsilanti water customers with their participation in this important safety program. YCUA has selected HydroCorp to assist with coordination, commercial site visits, and data and compliance management.

HydroCorp sends postal notice of upcoming cross-connection inspections.

HydroCorp hired by local water purveyor to assist with CCC Program.

Facility owners have the option to coordinate the date of on-site inspections by HydroCorp.

A YCUA employee and HydroCorp cross-connection surveyor arrive with I.D. to conduct the survey with permission from owner/occupant.

Surveyor documents cross-connections and any potential corrective actions, explains next steps to owner. Instructions are mailed to building owner with compliance due date.

Owner contacts HydroCorp when corrections are made and on-site compliance inspection is scheduled and completed.

HydroCorp hired by local water purveyor to assist with CCC Program.

HydroCorp sends postal notice of upcoming Cross-Connection Inspection. Toll-Free hotline number provided for FAQ.

Facility owners have the option to coordinate the date of onsite inspection by HydroCorp.

Cross-Connection Surveyor arrives with I.D. and conducts survey/inspection with permission by owner/occupant.

Surveyor documents existing and any potential corrective actions, explains next step responsibilities to owner. Corrective actions instructions are also mailed via postal to building owner with compliance due date.

Water Customer/Owner contacts HydroCorp when corrections are made and onsite compliance inspection is scheduled.

Commercial Facility Water Customers

Cross-Connection and Backflow FAQ

PART I: INSPECTIONS / SURVEYS

PART II: BACKFLOW PREVENTION ASSEMBLY TESTING

PART III: GENERAL RESOURCES

RESIDENTIAL WATER CUSTOMERS

Cross-Connection and Backflow FAQ

PART I: INSPECTIONS / SURVEYS

PART II: BACKFLOW PREVENTION ASSEMBLY TESTING

PART III: GENERAL RESOURCES